A last minute change of plans to an ongoing TTC project meant having to direct pedestrian traffic to an alternative parking lot. MHP was contacted the day before the temporary staircase was required and mobilized crew and equipment to get the required work done. A total of 4 helical piles were utilized to support the temporary stair case. Helical Piles were chosen as they could be easily removed once the staircase is no longer needed.