24 screw piles installed to support sea container structures modified as a training facility for the Six Nations Fire Department. The training facility simulated real house fire scenarios. The training facility was fabricated offsite and was brought to site once the helical piles were installed. Flat pile caps were welded to the top of the piles to allow connection of the structures to the top of the helical piles. The containers were hoisted into place using a mobile crane. Mascore Helical piles installed the foundation for this facility in 2 days.